
| Type | Description | ||
|---|---|---|---|
| Package Name | TO-220 | PD Max (W) | 33 |
| RDS(on) Max @ VGS = 2.5 V (mΩ) | ~NA~ | Configuration | Single |
| OPN in older Technology | 0 | Ciss Typ (pF) | 1265 |
| Case Outline | 221BN | Container Type | TUBE |
| Silicon Family | PowerTrench® T1 | VGS Max (V) | 20 |
| Vgs(th) Max (V) | 5 | Qg Typ @ VGS = 10 V (nC) | 33 |
| Coss Typ (pF) | 42 | Crss Typ (pF) | 1 |
| Package Type | TO-220 FULLPACK, 3-LEAD (ULTRA NARROW LEAD) | MSL Temp (°C) | 0 |
| Container Qty. | 1000 | Wide SOA Mosfets | 0 |
| V(BR)DSS Min (V) | 650 | RDS(on) Max @ VGS = 4.5 V (mΩ) | ~NA~ |
YG GROUP supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
FCPF380N65FL1-F154 is an authentic electronic component manufactured by onsemi, categorized under Transistors. It is supplied in the standard TO-220 package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official FCPF380N65FL1-F154 datasheet above.
Electronic component spot-market pricing for FCPF380N65FL1-F154 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for FCPF380N65FL1-F154 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Assess XC7Z010-1CLG400I design reuse with checks for the exact target, archived IP, tool releases, PS/PL interfaces, timing and board conditions. Keep global EDA and IP revenue growth separate from device demand or availability.
Read more →
Design MIC95410YFL-TR auxiliary rails by checking IN, VS, CTL, two-stage inrush, thermal paths, and output discharge. Compare four load switches with clear limits.
Read more →
TPS54329DDAR Load-Step Selection: LC Filter, Voltage Budget and Validation
Read more →
Select AD8221ARMZ-R7 for bridge sensing by checking ARM-grade limits, gain, common-mode voltage, reference drive, output swing and ADC loading. Compare four related instrumentation amplifiers without assuming direct replacement.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | onsemi | 6,790 | |||
![]() | onsemi | 2,420 | |||
![]() | onsemi | 6,200 | |||
![]() | onsemi | 3,030 | |||
![]() | onsemi | 8,180 | |||
![]() | onsemi | -- | 4,040 | ||
![]() | onsemi | 1,200 | |||
![]() | onsemi | 5,860 | |||
![]() | onsemi | 4,740 | |||
![]() | onsemi | 9,660 |