
| Type | Description | ||
|---|---|---|---|
| Pbfree Code | Yes | Part Life Cycle Code | End Of Life |
| Package Description | CSP-83 | Manufacturer Package Code | 570CK |
| Reach Compliance Code | compliant | Factory Lead Time | 4 Weeks |
| Additional Feature | GLOBAL SHUTTER; IT ALSO OPERATES AT 2.8 V ANALOG NOMINAL SUPPLY VOLTAGE; COLOR SENSITIVITY IS 22.3 KE/LUX.S | Array Type | FRAME |
| Body Breadth | 5.595 mm | Body Height | 0.666 mm |
| Body Length or Diameter | 9.995 mm | Dynamic Range | 71.4 dB |
| Frame Rate | 120 fps | Horizontal Pixel | 1920 |
| JESD-609 Code | e1 | Master Clock | 54 MHz |
| Mounting Feature | SURFACE MOUNT | Operating Current-Max | 250 mA |
| Operating Temperature-Max | 85 °C | Operating Temperature-Min | -40 °C |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
AR0234CSSC00SUKA0-CP1 is an authentic electronic component manufactured by onsemi, categorized under Vision Sensors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official AR0234CSSC00SUKA0-CP1 datasheet above.
Electronic component spot-market pricing for AR0234CSSC00SUKA0-CP1 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for AR0234CSSC00SUKA0-CP1 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Buying LP8860HQVFPRQ1 for a vehicle display? Check the H-version 80-mA setup, related drivers and build-based demand. Request a project quote.
Read more →
Sourcing TDA21590 for an AI power BOM? Separate the C2i deal from phase, controller and package choices. Request a quote for your approved build.
Read more →
REF200AU is obsolete with no last-time buy. Check sensor headroom, error limits and LM334 redesign differences, then request a quote for existing builds.
Read more →
Buying SX1302IMLTRT for a gateway? Check RF, power and host requirements, compare SX1303 fine timestamping, and request a project-specific quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | onsemi | 4,910 | |||
![]() | onsemi | 5,860 | |||
![]() | onsemi | 7,890 | |||
![]() | onsemi | 6,990 | |||
![]() | onsemi | 5,910 | |||
![]() | onsemi | -- | 4,860 | ||
![]() | onsemi | 2,980 | |||
![]() | onsemi | 5,010 | |||
![]() | onsemi | 1,010 | |||
![]() | onsemi | 1,290 |