
| Type | Description | ||
|---|---|---|---|
| Part Life Cycle Code | Active | Reach Compliance Code | compliant |
| Factory Lead Time | 28 Weeks | Adjustable Threshold | NO |
| Analog IC - Other Type | POWER SUPPLY SUPPORT CIRCUIT | JESD-30 Code | S-XQCC-N20 |
| JESD-609 Code | e3 | Length | 4 mm |
| Moisture Sensitivity Level | 1 | Number of Channels | 1 |
| Number of Functions | 1 | Number of Terminals | 20 |
| Operating Temperature-Max | 125 °C | Operating Temperature-Min | -40 °C |
| Package Body Material | UNSPECIFIED | Package Code | HVQCCN |
| Package Equivalence Code | LCC20,.16SQ,20 | Package Shape | SQUARE |
| Package Style | CHIP CARRIER, HEAT SINK/SLUG, VERY THIN PROFILE | Screening Level | AEC-Q100 |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MPQ5031GRE-0001-AEC1-Z is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MPQ5031GRE-0001-AEC1-Z datasheet above.
Electronic component spot-market pricing for MPQ5031GRE-0001-AEC1-Z fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MPQ5031GRE-0001-AEC1-Z depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Buying LP8860HQVFPRQ1 for a vehicle display? Check the H-version 80-mA setup, related drivers and build-based demand. Request a project quote.
Read more →
Sourcing TDA21590 for an AI power BOM? Separate the C2i deal from phase, controller and package choices. Request a quote for your approved build.
Read more →
REF200AU is obsolete with no last-time buy. Check sensor headroom, error limits and LM334 redesign differences, then request a quote for existing builds.
Read more →
Buying SX1302IMLTRT for a gateway? Check RF, power and host requirements, compare SX1303 fine timestamping, and request a project-specific quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | 7,600 | |||
![]() | Monolithic Power Systems | -- | 7,340 | ||
![]() | Monolithic Power Systems | -- | 6,740 | ||
![]() | Monolithic Power Systems | -- | 6,170 | ||
![]() | Monolithic Power Systems | -- | 3,090 | ||
![]() | Monolithic Power Systems | 6,730 | |||
![]() | Monolithic Power Systems | -- | 1,690 | ||
![]() | Monolithic Power Systems | -- | 8,200 | ||
![]() | Monolithic Power Systems | 3,080 | |||
![]() | Monolithic Power Systems | 4,670 |