
The MP2976 is a dual-loop, digital, multi-phase controller that provides power for the CPU core of VR13.HC platforms. It works with MPS’s and multiple vendors’ DrMOS products (including MPS’s Intelli-PhaseTM) to provide a multi-phase voltage regulator (VR) solution with a minimal number of external components. The device can be configured for single-phase operation for rail 1 and rail 2. The MP2976 provides an on-chip non-volatile memory (NVM) to store and restore device configurations. Device configurations and fault parameters are easy to configure or monitor via the PMBus/I2C interface. The device can monitor and report the output current (IOUT) through the current-sense (CS) output from DrMOS products. The MP2976 is based on unique, digital, multi-phase, nonlinear control to provide fast transient response to load transients with minimal output capacitors. With only one power loop control method for both steady state and load transient, power loop compensation is simple to configure. The MP2976 is available in a QFN-40 (5mmx5mm) package.
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MP2976GU-0000-P is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MP2976GU-0000-P datasheet above.
Electronic component spot-market pricing for MP2976GU-0000-P fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MP2976GU-0000-P depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Buying LP8860HQVFPRQ1 for a vehicle display? Check the H-version 80-mA setup, related drivers and build-based demand. Request a project quote.
Read more →
Sourcing TDA21590 for an AI power BOM? Separate the C2i deal from phase, controller and package choices. Request a quote for your approved build.
Read more →
REF200AU is obsolete with no last-time buy. Check sensor headroom, error limits and LM334 redesign differences, then request a quote for existing builds.
Read more →
Buying SX1302IMLTRT for a gateway? Check RF, power and host requirements, compare SX1303 fine timestamping, and request a project-specific quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | 4,500 | |||
![]() | Monolithic Power Systems | 3,840 | |||
![]() | Monolithic Power Systems | 6,620 | |||
![]() | Monolithic Power Systems | 7,510 | |||
![]() | Monolithic Power Systems | -- | 3,760 | ||
![]() | Monolithic Power Systems | -- | 5,640 | ||
![]() | Monolithic Power Systems | 6,890 | |||
![]() | Monolithic Power Systems | 2,260 | |||
![]() | Monolithic Power Systems | 4,170 | |||
![]() | Monolithic Power Systems | 5,170 |