
The MP111 is a dying gasp storage and release controller. It charges storage capacitor from the input during normal operation. Once the storage capacitor is charged to the selected voltage, the charge is stopped, and the storage capacitor is separated from the input. The charging circuit maintains the storage voltage after the charge is completed. The MP111 keeps monitoring the input voltage, and releases the charge from storage capacitor to input capacitor when the input voltage is lower than the selected release voltage. It regulates the input voltage to keep it close to release voltage for as long as possible.The MP111 has built-in current limit circuit during the charging up of the storage capacitors. The storage and release voltage can be programmed to user’s desired value by external resistors.The MP111 comes in an SOIC-8 package and requires a minimum number of readily available standard external components.
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MP111DS-LF-P is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MP111DS-LF-P datasheet above.
Electronic component spot-market pricing for MP111DS-LF-P fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MP111DS-LF-P depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Buying LP8860HQVFPRQ1 for a vehicle display? Check the H-version 80-mA setup, related drivers and build-based demand. Request a project quote.
Read more →
Sourcing TDA21590 for an AI power BOM? Separate the C2i deal from phase, controller and package choices. Request a quote for your approved build.
Read more →
REF200AU is obsolete with no last-time buy. Check sensor headroom, error limits and LM334 redesign differences, then request a quote for existing builds.
Read more →
Buying SX1302IMLTRT for a gateway? Check RF, power and host requirements, compare SX1303 fine timestamping, and request a project-specific quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | -- | 5,990 | ||
![]() | Monolithic Power Systems | 2,850 | |||
![]() | Monolithic Power Systems | -- | 4,300 | ||
![]() | Monolithic Power Systems | -- | 2,480 | ||
![]() | Monolithic Power Systems | 4,830 | |||
![]() | Monolithic Power Systems | -- | 6,620 | ||
![]() | Monolithic Power Systems | -- | 2,310 | ||
![]() | Monolithic Power Systems | -- | 7,040 | ||
![]() | Monolithic Power Systems | 7,100 | |||
![]() | Monolithic Power Systems | -- | 6,900 |