
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR) | Part Status | Obsolete |
| Manufacturer Lead Time | 11 Weeks | Current - Reverse Leakage @ Vr | 2 µA @ 4 V |
| Impedance (Max) (Zzt) | 15 Ohms | Mounting Type | Through Hole |
| Operating Temperature | -65°C ~ 200°C | Package / Case | DO-204AH, DO-35, Axial |
| Power - Max | 500 mW | Supplier Device Package | DO-35 |
| Tolerance | ±5% | Voltage - Forward (Vf) (Max) @ If | 1.5 V @ 100 mA |
| Voltage - Zener (Nom) (Vz) | 6.8 V | ExportControlClassNumber | EAR99 |
| HtsusCode | 8541.10.0050 | MoistureSensitivityLevel | 1 (Unlimited) |
| ReachStatus | REACH Unaffected | RoHS Status | Non-RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BZX79C6V8_T50R is an authentic electronic component manufactured by onsemi, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BZX79C6V8_T50R datasheet above.
Electronic component spot-market pricing for BZX79C6V8_T50R fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BZX79C6V8_T50R depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Ordering LMR14050SSQDDARQ1? Review SS and SYNC behavior, external power components and thermal requirements. Request a quote for your BOM.
Read more →
An SN74AHC373PWR BOM change needs bus-level approval. Compare latch timing, logic margins and two related TI codes. Request a quote from YG GROUP.
Read more →
Choose REF35330QDBVR for the required measurement budget. Check current over temperature, accuracy and voltage alternatives. Request a quote.
Read more →
Budget TPS5430DDAR as a complete power stage. Assess diode, inductor and thermal needs alongside related TI regulators. Request a project quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | onsemi | 4,460 | |||
![]() | onsemi | 9,570 | |||
![]() | onsemi | 4,580 | |||
![]() | onsemi | 2,120 | |||
![]() | onsemi | 6,630 | |||
![]() | onsemi | 2,760 | |||
![]() | onsemi | 3,670 | |||
![]() | onsemi | 3,560 | |||
![]() | onsemi | 9,490 | |||
![]() | onsemi | 5,170 |