
LCMXO2-7000HC-4FTG256I: 3.3V HC Rails, EFB & ftBGA-256
Approving LCMXO2-7000HC-4FTG256I for board I/O bridging? Check 3.3V HC vs 1.2V ZE rails, EFB RXDR bus stalls and FTG256 vs BG256 fit. Request a quote.
Read more →
| Type | Description | ||
|---|---|---|---|
| Contact Plating | Tin | Mount | Surface Mount |
| Mounting Type | Surface Mount | Package / Case | 8-TSSOP (0.173, 4.40mm Width) |
| Operating Temperature | 0°C~70°C | Packaging | Tape & Reel (TR) |
| Published | 2002 | JESD-609 Code | e3 |
| Pbfree Code | yes | Part Status | Obsolete |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | Number of Terminations | 8 |
| ECCN Code | EAR99 | Type | Frequency Modulator, Spread Spectrum Clock Generator |
| Voltage - Supply | 3V~3.6V | Terminal Position | DUAL |
| Terminal Form | GULL WING | Peak Reflow Temperature (Cel) | NOT SPECIFIED |
| Supply Voltage | 3.3V | Terminal Pitch | 0.65mm |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
ASM3P2812AF-08TR is an authentic electronic component manufactured by onsemi, categorized under Clock & Timer ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official ASM3P2812AF-08TR datasheet above.
Electronic component spot-market pricing for ASM3P2812AF-08TR fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for ASM3P2812AF-08TR depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Approving LCMXO2-7000HC-4FTG256I for board I/O bridging? Check 3.3V HC vs 1.2V ZE rails, EFB RXDR bus stalls and FTG256 vs BG256 fit. Request a quote.
Read more →
Driving inductive loads with VNLD5300TR-E? Check the 3.5V max input threshold on 3.3V MCUs, 2A–3.8A current limit and thermal restart. Request a quote.
Read more →
Building digital power on STM32G474MET6? Map LQFP80 HRTIM fault pins, verify 512KB dual-bank flash updates and check MET3/RET6 limits. Request a quote.
Read more →
Sourcing ADS1278IPAPT for simultaneous 24-bit DAQ? Compare 144kSPS vs 31mW/ch pin-selected modes, SPI/frame-sync data and PowerPAD. Request a quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
| onsemi | 2,720 | ||||
| onsemi | 4,960 | ||||
| onsemi | 4,750 | ||||
| onsemi | 6,370 | ||||
| onsemi | 6,910 | ||||
| onsemi | 1,430 | ||||
| onsemi | 7,390 | ||||
| onsemi | 5,030 | ||||
| onsemi | 1,960 | ||||
| onsemi | 6,110 |