
LMX2594RHAT: 15GHz Phase Sync, SYSREF & VQFN-40 Timing
Designing multi-channel RF clocks on LMX2594RHAT? Separate 15GHz phase sync from JESD204B SYSREF capture and lock VQFN-40 reel specs. Request a quote.
Read more →
| Type | Description | ||
|---|---|---|---|
| Manufacturer Part Number | DSS6NC52A221T51B | Rohs Code | Yes |
| Part Life Cycle Code | Obsolete | Reach Compliance Code | compliant |
| ECCN Code | EAR99 | HTS Code | 8504.50.80.00 |
| Factory Lead Time | 9 Weeks | Risk Rank | 5.83 |
| Additional Feature | BUILT-IN FERRITE BEAD TYPE STRUCTURE; INCRIMP LEAD TYPE | Capacitance | 220 µF |
| Filter Type | DATA LINE FILTER | Height | 10 mm |
| Length | 8 mm | Mounting Type | THROUGH HOLE MOUNT |
| Number of Functions | 1 | Operating Temperature-Max | 85 °C |
| Operating Temperature-Min | -25 °C | Packing Method | BULK |
| Physical Dimension | L8.0XB2.54XH10.0 (mm)/L0.315XB0.1XH0.394 (inch) | Rated Current | 6 A |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
DSS6NC52A221T51B is an authentic electronic component manufactured by Murata, categorized under Circuit Protection Kits. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official DSS6NC52A221T51B datasheet above.
Electronic component spot-market pricing for DSS6NC52A221T51B fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for DSS6NC52A221T51B depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Designing multi-channel RF clocks on LMX2594RHAT? Separate 15GHz phase sync from JESD204B SYSREF capture and lock VQFN-40 reel specs. Request a quote.
Read more →
Approving TMS320F28379DPTPT for production? Verify the 9-pair HLQFP176 ADC map, CPU1/CPU2 IPC boot and PowerPAD solder spec vs ZWT. Request a BOM quote.

NCP13992ACDR2G is an onsemi SOIC-16 LLC controller. Compare quiet skip, dead-time fault recovery and external OVP/OTP latch behavior. Request a quote.
Read more →
SCT040HU65G3AG is an STMicroelectronics 650 V SiC MOSFET in HU3PAK. Check heat-sink insulation and the Kelvin gate return before sourcing. Request a quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
| Murata | - | 1,670 | |||
| Murata | - | 3,460 | |||
| Murata | - | 2,970 | |||
| Murata | - | 9,480 | |||
| Murata | - | 8,860 | |||
| Murata | - | 3,460 | |||
| Murata | - | 7,270 | |||
| Murata | 8,410 | ||||
| Murata | - | 3,600 | |||
| Murata | - | 4,220 |