BOM
  • BOM
  • Email
  • LinkedIn
  • Teams
  • WhatsApp

RFQ List

0 Products

Use the + button to add products to your RFQ list.

SUBMIT NOW
  • Home
  • RFQ/EI
  • Products
  • Categories
  • Manufacturers
  • Tools
  • Blog
  • About Us
  • Contact Us

Company

  • About Us
  • Five Strengths
  • Quality Control
  • Certifications
  • Contact Us

Services

  • RFQ
  • EI
  • BOM
  • Solutions
  • Tools

Resources

  • Categories
  • Products
  • Manufacturers
  • Blog
  • News and Events

Legal

  • Privacy Policies
  • Terms of Sale
  • Cookies, Ads & Emails
  • Payment Policy
  • Shipping & Delivery
  • Refund & Return Policy

Contact

[email protected]

Get the latest tech insights

© 2026 YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD). All rights reserved.

  1. Home
  2. /Products
  3. /Uncategorized
  4. /Unclassified
  5. /AC7MDT20-T80
AC7MDT20-T80 thumbnail 1
STMicroelectronics

AC7MDT20-T80

Category
Unclassified
Manufacturer
STMicroelectronicsDetails
RoHS Status
Datasheet
Description
—
Similar Products
—
Quality Control
Authentic & Traceable
Shipping (In-stock)
1-3 business days
Quote Response
Within 24 Hours
Stock Status9410
QuantityAC7MDT20-T80
Country

Get Tiered Pricing (Submit RFQ)

Specification
Documentation
TypeDescriptionTypeDescription
Factory Lead Time12 WeeksPart StatusActive
Moisture Sensitivity Level (MSL)Not ApplicableBase Part NumberAC7MDT20
Accessory TypeTarget BoardEvaluation KitYes
RoHS StatusRoHS Compliant
Certified Quality & Compliance
Purchase & Inquiry
Secure Packaging
Shipping & Availability
Payment

YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.

  • 1. Certification Scope: Quality certifications apply only to the entities, sites and activities listed in valid certificates. Management system certification does not certify each individual product.
  • 2. Product Authenticity: Products must match the agreed manufacturer, part number and condition. Supplier screening and authenticity checks help reduce counterfeit risk.
  • 3. Inspection & Testing: The inspection scope follows product risks and agreed requirements. Additional testing, laboratory arrangements, costs and lead times require written confirmation.
  • 4. Traceability & Documentation: Request conformity certificates, traceability records or test reports before ordering. Document availability, issuer and coverage must be confirmed for the offered goods.
  • 5. Environmental Compliance: RoHS and REACH information is based on applicable manufacturer documentation. Confirm the exact part, declaration date and relevant exemptions before ordering.
  • 6. Handling & Protection: Handling, storage and packaging follow applicable product requirements, including ESD and moisture protection where required. Special handling requirements must be agreed before ordering.
ERAI
ISO 9001
ESD Control

Loading related products…

Product FAQ
Purchasing FAQ

What type of component is AC7MDT20-T80, and what package does it use?

AC7MDT20-T80 is an authentic electronic component manufactured by STMicroelectronics, categorized under Unclassified. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official AC7MDT20-T80 datasheet above.

Why is pricing for AC7MDT20-T80 available via RFQ rather than a fixed checkout price?

Electronic component spot-market pricing for AC7MDT20-T80 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.

How quickly can AC7MDT20-T80 be shipped once quoted?

Lead times for AC7MDT20-T80 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.

Loading articles…

10 similar parts

Loading related products…

Similar products
Hot products
PicturePart NumberManufacturerPDF / RoHSStockAction
X-NUCLEO-AMICAM1
X-NUCLEO-AMICAM1
STMicroelectronics
PDF-
3,420
RFQ
RF3L05400CB4
RF3L05400CB4
STMicroelectronics
PDF-
3,930
RFQ
A1C15S12M3-F
A1C15S12M3-F
STMicroelectronics
PDF-
4,410
RFQ
RLINK-ST
RLINK-ST
STMicroelectronics
PDF
4,770
RFQ
RF2L42008CG2
RF2L42008CG2
STMicroelectronics
PDF-
5,460
RFQ
SCTHCT250N12G3AG
SCTHCT250N12G3AG
STMicroelectronics
PDF-
3,280
RFQ
ST19AF08BER2QMAA
ST19AF08BER2QMAA
STMicroelectronics
--
8,690
RFQ
RF2L15200CB4
RF2L15200CB4
STMicroelectronics
PDF-
5,230
RFQ
SPC560B44L5B4EVX
SPC560B44L5B4EVX
STMicroelectronics
--
2,110
RFQ
M24C01-WMN6P CKSM: 0078AC
M24C01-WMN6P CKSM: 0078AC
STMicroelectronics
--
7,390
RFQ
  • All Categories
  • Discrete Semiconductors
  • Embedded Processors & Controllers
  • Integrated Circuits - ICs
  • Memory ICs
  • Wireless & RF Semiconductors
  • Circuit Protection
  • Connectors
  • Electromechanical
  • Embedded Solutions
  • Optoelectronics
  • Passive Components
  • Power
  • Sensors
  • Wire & Cable
  • Tools & Supplies
  • Uncategorized
  • All Categories
  • Unclassified

Loading articles…

New Blog

GRM155C80J106ME11D: Buy for DC-Bias Needs | YG GROUP

Buying GRM155C80J106ME11D for a compact board? Compare effective capacitance, bias and packaging—not 10 µF alone. Send your rail requirements for an RFQ.

Read more →

TPS53915RVER: Map Server POL and PMBus Needs | YG GROUP

Sourcing TPS53915RVER for a server rail? Map 12-A loads, bias supplies and PMBus functions before buying. Send your power-rail requirements for an RFQ.

Read more →

TPS1HB16AQPWPRQ1: Inrush and Fault Choices | YG GROUP

Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.

Read more →

W5500: Match IPv4, SPI and Socket Needs | YG GROUP

Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.

Read more →