
| Type | Description | ||
|---|---|---|---|
| Package | SOP-4-1.3mm | Temperature Range | -40℃~+125℃@(Tj) |
| Output Type | Push-Pull | ChipType | Voltage Detector |
| Threshold Voltage | 1.5V | Number of Voltages Monitored | 1 |
| CNHTS | 8542399000 | USHTS | 8542390001 |
| TARIC | 8542399000 | CAHTS | 8542390000 |
| BRHTS | 85423999 | INHTS | 85423900 |
| MXHTS | 8542.39.99 |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BU4915F-TR is an authentic electronic component manufactured by ROHM, categorized under Power Management ICs. It is supplied in the standard SOP-4-1.3mm package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BU4915F-TR datasheet above.
Electronic component spot-market pricing for BU4915F-TR fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BU4915F-TR depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | ROHM | 3,650 | |||
![]() | ROHM | 7,260 | |||
![]() | ROHM | 2,640 | |||
![]() | ROHM | 1,880 | |||
![]() | ROHM | 7,960 | |||
![]() | ROHM | 7,410 | |||
![]() | ROHM | 9,280 | |||
![]() | ROHM | 4,380 | |||
![]() | ROHM | 6,740 | |||
![]() | ROHM | 9,740 |