
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR), Cut Tape (CT) | Part Status | Active |
| Manufacturer Lead Time | 14 Weeks | Fault Protection | Current Limiting, Over Load, Over Voltage |
| Frequency - Switching | 120kHz | Internal Switch(s) | No |
| Mounting Type | Surface Mount | Operating Temperature | -40°C ~ 150°C (TJ) |
| Output Isolation | Isolated | Package / Case | 8-SOIC (0.154", 3.90mm Width) |
| Supplier Device Package | 8-SOP-J | Topology | Flyback |
| Voltage - Start Up | 19.5 V | Voltage - Supply (Vcc/Vdd) | 15V ~ 27.5V |
| ExportControlClassNumber | EAR99 | HtsusCode | 8542.39.0090 |
| MoistureSensitivityLevel | 1 (Unlimited) | ReachStatus | REACH Unaffected |
| RoHS Status | RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BD7682FJ-LBE2 is an authentic electronic component manufactured by ROHM, categorized under Interface ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BD7682FJ-LBE2 datasheet above.
Electronic component spot-market pricing for BD7682FJ-LBE2 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BD7682FJ-LBE2 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | ROHM | - | 9,180 | ||
![]() | ROHM | - | 5,470 | ||
![]() | ROHM | - | 5,700 | ||
![]() | ROHM | 8,860 | |||
![]() | ROHM | 5,620 | |||
![]() | ROHM | - | 7,010 | ||
![]() | ROHM | 6,480 | |||
![]() | ROHM | - | 6,890 | ||
![]() | ROHM | 3,470 | |||
![]() | ROHM | 3,180 |