
MT25QU512ABB8ESF-0SIT EOL: PCN 36228 SO16W vs TBGA24 BOM
Managing MT25QU512ABB8ESF-0SIT EOL after PCN 36228? Separate post-LTB SO16W lot verification from MT25QU512ABB8E12-0AAT TBGA24 respins. Request a quote.
Read more →
| Type | Description | ||
|---|---|---|---|
| Packaging | Bulk | Part Status | Active |
| Manufacturer Lead Time | 28 Weeks | Current - Collector (Ic) (Max) | 1.5 A |
| DC Current Gain (hFE) (Min) @ Ic, Vce | 63 @ 150mA, 2V | Frequency - Transition | 50MHz |
| Mounting Type | Surface Mount | Operating Temperature | -65°C ~ 150°C (TJ) |
| Package / Case | TO-261-4, TO-261AA | Power - Max | 1.5 W |
| Supplier Device Package | SOT-223 (TO-261) | Transistor Type | PNP |
| Vce Saturation (Max) @ Ib, Ic | 500mV @ 50mA, 500mA | Voltage - Collector Emitter Breakdown (Max) | 80 V |
| ExportControlClassNumber | EAR99 | HtsusCode | 8541.29.0075 |
| MoistureSensitivityLevel | 1 (Unlimited) | ReachStatus | REACH Unaffected |
| RohsStatus | RoHS non-compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BCP53-10T1 is an authentic electronic component manufactured by onsemi, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BCP53-10T1 datasheet above.
Electronic component spot-market pricing for BCP53-10T1 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BCP53-10T1 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Managing MT25QU512ABB8ESF-0SIT EOL after PCN 36228? Separate post-LTB SO16W lot verification from MT25QU512ABB8E12-0AAT TBGA24 respins. Request a quote.
Read more →
Supplying off-board ECU sensors with TLS115D0EJXUMA1? Budget ±5mV reference tracking, PG open-drain diagnostics and DSO-8EP heat. Request a BOM quote.
Read more →
Designing a battery sensor node on STM32L431RCT6? Verify STOP2 board current, LPUART first-frame wake vs EXTI and LQFP64 alternates. Request a quote.
Read more →
Reordering MT41K128M16JT-125:K for embedded boards? Lock 2Gb x16 DDR3L-1600 CL11 timing, :K die, IT:K temp grade and PCN status. Request a lot quote.
Read more →Get the latest tech insights
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
| onsemi | 5,870 | ||||
| onsemi | 8,760 | ||||
| onsemi | 5,190 | ||||
| onsemi | 3,620 | ||||
| onsemi | 5,470 | ||||
| onsemi | 4,790 | ||||
| onsemi | 2,230 | ||||
| onsemi | 1,470 | ||||
| onsemi | 6,620 | ||||
| onsemi | 9,240 |