
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR) | Part Status | Obsolete |
| Manufacturer Lead Time | 44 Weeks | Current - Continuous Drain (Id) @ 25°C | 100A (Ta) |
| Drain to Source Voltage (Vdss) | 60 V | Drive Voltage (Max Rds On, Min Rds On) | 4V, 10V |
| FET Type | P-Channel | Gate Charge (Qg) (Max) @ Vgs | 280 nC @ 10 V |
| Input Capacitance (Ciss) (Max) @ Vds | 13200 pF @ 20 V | Mounting Type | Surface Mount |
| Operating Temperature | 150°C (TJ) | Package / Case | TO-263-3, D2PAK (2 Leads + Tab), TO-263AB |
| Power Dissipation (Max) | 90W (Tc) | Rds On (Max) @ Id, Vgs | 5.8mOhm @ 50A, 10V |
| Supplier Device Package | TO-263 (D2PAK) | Technology | MOSFET (Metal Oxide) |
| Vgs (Max) | ±20V | ExportControlClassNumber | EAR99 |
| HtsusCode | 8541.29.0095 | MoistureSensitivityLevel | 1 (Unlimited) |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BBS3002-DL-1E is an authentic electronic component manufactured by onsemi, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BBS3002-DL-1E datasheet above.
Electronic component spot-market pricing for BBS3002-DL-1E fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BBS3002-DL-1E depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Choose TPS53513RVER Eco-mode or FCCM using load noise, idle power and startup settings, with clear ripple calculations and practical measurement checks.
Read more →
Route MT41K256M16TW-107:P DDR3L with clear VREF, VTT and ODT roles, byte-lane timing, continuous return paths and a documented initialization and validation plan.
Read more →
Build a recoverable W25Q128JVSIQ firmware update around page boundaries, erase timing, BUSY/SUS status, power-up rules and a preserved bootable image.
Read more →
Check PIC16F84A-04I/P EEPROM completion, WRERR reset limits, watchdog timing and two-slot recovery before treating a configuration update as safely saved.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | onsemi | 9,940 | |||
![]() | onsemi | 5,720 | |||
![]() | onsemi | 5,110 | |||
![]() | onsemi | -- | 8,980 | ||
![]() | onsemi | 6,640 | |||
![]() | onsemi | 5,580 | |||
![]() | onsemi | 2,980 | |||
![]() | onsemi | 1,140 | |||
![]() | onsemi | 1,560 | |||
![]() | onsemi | 7,370 |