
| Type | Description | ||
|---|---|---|---|
| Packaging | Cut Tape (CT), Tape & Box (TB) | Part Status | Active |
| Manufacturer Lead Time | 8 Weeks | Current - Reverse Leakage @ Vr | 50 nA @ 10.5 V |
| Impedance (Max) (Zzt) | 15 Ohms | Mounting Type | Through Hole |
| Operating Temperature | 200°C | Package / Case | DO-204AL, DO-41, Axial |
| Power - Max | 1 W | Supplier Device Package | DO-41 |
| Tolerance | ±5% | Voltage - Forward (Vf) (Max) @ If | 1 V @ 50 mA |
| Voltage - Zener (Nom) (Vz) | 15 V | ExportControlClassNumber | EAR99 |
| HtsusCode | 8541.10.0050 | MoistureSensitivityLevel | 1 (Unlimited) |
| ReachStatus | REACH Unaffected | RoHS Status | RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BZV85-C15,133 is an authentic electronic component manufactured by Nexperia, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BZV85-C15,133 datasheet above.
Electronic component spot-market pricing for BZV85-C15,133 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BZV85-C15,133 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Buying GRM155C80J106ME11D for a compact board? Compare effective capacitance, bias and packaging—not 10 µF alone. Send your rail requirements for an RFQ.
Read more →
Sourcing TPS53915RVER for a server rail? Map 12-A loads, bias supplies and PMBus functions before buying. Send your power-rail requirements for an RFQ.
Read more →
Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.
Read more →
Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Nexperia | 4,850 | |||
![]() | Nexperia | -- | 8,980 | ||
![]() | Nexperia | 2,560 | |||
![]() | Nexperia | 5,200 | |||
![]() | Nexperia | 7,110 | |||
![]() | Nexperia | -- | 9,550 | ||
![]() | Nexperia | 5,290 | |||
![]() | Nexperia | 3,660 | |||
![]() | Nexperia | 6,220 | |||
![]() | Nexperia | 9,710 |