
| Type | Description | ||
|---|---|---|---|
| Series | BCP53-Q | Packaging | Tape & Reel (TR), Cut Tape (CT) |
| Part Status | Active | Manufacturer Lead Time | 16 Weeks |
| Current - Collector (Ic) (Max) | 1 A | Current - Collector Cutoff (Max) | 100nA (ICBO) |
| DC Current Gain (hFE) (Min) @ Ic, Vce | 100 @ 150mA, 2V | Frequency - Transition | 145MHz |
| Grade | Automotive | Mounting Type | Surface Mount |
| Operating Temperature | 150°C (TJ) | Package / Case | TO-261-4, TO-261AA |
| Power - Max | 650 mW | Qualification | AEC-Q101 |
| Supplier Device Package | SOT-223 | Transistor Type | PNP |
| Vce Saturation (Max) @ Ib, Ic | 500mV @ 50mA, 500mA | Voltage - Collector Emitter Breakdown (Max) | 80 V |
| ExportControlClassNumber | EAR99 | HtsusCode | 8541.29.0095 |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BCP53-16-QF is an authentic electronic component manufactured by Nexperia, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BCP53-16-QF datasheet above.
Electronic component spot-market pricing for BCP53-16-QF fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BCP53-16-QF depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.
Read more →
Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.
Read more →
Using ISM330DHCXTR for motion offload? Check MLC rates, event latency and host duties before expanding the BOM. Send your sensor requirements for an RFQ.
Read more →
Evaluating ISOW1432DFMR? Compare integrated power, bus speed and EMC layout needs before ordering. Send your RS-485 port requirements for an RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Nexperia | 6,540 | |||
![]() | Nexperia | 6,440 | |||
![]() | Nexperia | 9,250 | |||
![]() | Nexperia | 8,270 | |||
![]() | Nexperia | 2,510 | |||
![]() | Nexperia | 7,090 | |||
![]() | Nexperia | 5,470 | |||
![]() | Nexperia | 4,650 | |||
![]() | Nexperia | -- | 5,760 | ||
![]() | Nexperia | 7,310 |