
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR) | Part Status | Active |
| Manufacturer Lead Time | 8 Weeks | Current - Average Rectified (Io) (per Diode) | 200mA |
| Current - Reverse Leakage @ Vr | 100 nA @ 200 V | Diode Configuration | 3 Independent |
| Grade | Automotive | Mounting Type | Surface Mount |
| Operating Temperature - Junction | 150°C | Package / Case | SC-74, SOT-457 |
| Qualification | AEC-Q101 | Reverse Recovery Time (trr) | 50 ns |
| Speed | Small Signal =< 200mA (Io), Any Speed | Supplier Device Package | 6-TSOP |
| Technology | Standard | Voltage - DC Reverse (Vr) (Max) | 200 V |
| Voltage - Forward (Vf) (Max) @ If | 1.25 V @ 200 mA | ReachStatus | REACH Unaffected |
| RoHS Status | RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
BAS21AVD-QF is an authentic electronic component manufactured by Nexperia, categorized under Transistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official BAS21AVD-QF datasheet above.
Electronic component spot-market pricing for BAS21AVD-QF fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for BAS21AVD-QF depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Buying GRM155C80J106ME11D for a compact board? Compare effective capacitance, bias and packaging—not 10 µF alone. Send your rail requirements for an RFQ.
Read more →
Sourcing TPS53915RVER for a server rail? Map 12-A loads, bias supplies and PMBus functions before buying. Send your power-rail requirements for an RFQ.
Read more →
Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.
Read more →
Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Nexperia | 7,880 | |||
![]() | Nexperia | 2,520 | |||
![]() | Nexperia | 3,090 | |||
![]() | Nexperia | -- | 2,240 | ||
![]() | Nexperia | 6,340 | |||
![]() | Nexperia | 1,100 | |||
![]() | Nexperia | 1,990 | |||
![]() | Nexperia | 9,180 | |||
![]() | Nexperia | 4,840 | |||
![]() | Nexperia | 6,790 |