
| Type | Description | ||
|---|---|---|---|
| Part Life Cycle Code | Active | Package Description | QFN-20 |
| Reach Compliance Code | compliant | Factory Lead Time | 24 Weeks |
| Analog IC - Other Type | SWITCHING REGULATOR | Control Mode | CURRENT-MODE |
| Control Technique | PULSE WIDTH MODULATION | Input Voltage-Max | 45 V |
| Input Voltage-Min | 3.3 V | Input Voltage-Nom | 12 V |
| JESD-30 Code | S-XQCC-N20 | JESD-609 Code | e3 |
| Length | 4 mm | Moisture Sensitivity Level | 1 |
| Number of Functions | 1 | Number of Terminals | 20 |
| Operating Temperature-Max | 125 °C | Operating Temperature-Min | -40 °C |
| Output Current-Max | 5 A | Output Voltage-Max | 42.75 V |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MP4315GRE-Z is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MP4315GRE-Z datasheet above.
Electronic component spot-market pricing for MP4315GRE-Z fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MP4315GRE-Z depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | 5,060 | |||
![]() | Monolithic Power Systems | -- | 9,800 | ||
![]() | Monolithic Power Systems | -- | 4,400 | ||
![]() | Monolithic Power Systems | 5,510 | |||
![]() | Monolithic Power Systems | 3,710 | |||
![]() | Monolithic Power Systems | -- | 7,240 | ||
![]() | Monolithic Power Systems | -- | 2,230 | ||
![]() | Monolithic Power Systems | -- | 6,660 | ||
![]() | Monolithic Power Systems | 2,220 | |||
![]() | Monolithic Power Systems | 1,240 |