
| Type | Description | ||
|---|---|---|---|
| Pbfree Code | Yes | RoHS Status | RoHS Compliant |
| Part Life Cycle Code | Active | Part Package Code | SOIC |
| Package Description | SOIC-8 | Pin Count | 8 |
| Reach Compliance Code | compliant | ECCN Code | EAR99 |
| HTS Code | 8542.39.00.01 | Factory Lead Time | 24 Weeks |
| Additional Feature | OPERATES IN ADJUSTABLE MODE FROM 0.8 TO 47V | Analog IC - Other Type | SWITCHING REGULATOR |
| Control Mode | CURRENT-MODE | Control Technique | PULSE WIDTH MODULATION |
| Input Voltage-Max | 50 V | Input Voltage-Min | 4.5 V |
| Input Voltage-Nom | 12 V | JESD-30 Code | R-PDSO-G8 |
| JESD-609 Code | e3 | Length | 4.9 mm |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MP2565DN-LF-Z is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MP2565DN-LF-Z datasheet above.
Electronic component spot-market pricing for MP2565DN-LF-Z fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MP2565DN-LF-Z depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | -- | 7,920 | ||
![]() | Monolithic Power Systems | 8,780 | |||
![]() | Monolithic Power Systems | -- | 1,820 | ||
![]() | Monolithic Power Systems | -- | 5,480 | ||
![]() | Monolithic Power Systems | 5,660 | |||
![]() | Monolithic Power Systems | -- | 5,060 | ||
![]() | Monolithic Power Systems | -- | 2,270 | ||
![]() | Monolithic Power Systems | -- | 7,270 | ||
![]() | Monolithic Power Systems | 1,150 | |||
![]() | Monolithic Power Systems | -- | 2,750 |