
The EV5991-V-4PHASE-00A is an evaluation board designed to demonstrate the capabilities of multiple MP5991 devices operating in parallel. The evaluation board contains four phases for the MP5991, which enables it to be easily configured between one phase and four phases. The EV5991-V-4PHASE-00A provides robust test pins and LED indications to simplify system evaluation. The pins of each paralleled MP5991 can be probed via the test pins, which makes it simple to understand the MP5991's operating principles. The EV5991-V-4PHASE-00A is compatible with discrete power source terminals and a power supply unit (PSU) interface, which can meet different power supply verification requirements. The MP5991 is available in an LGA-32 (5mmx5mm) package. The EV5991-V-4PHASE-00A has 4 layers that are 2oz each, and its total size is 11cmx15cm.
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
EV5991-V-4PHASE-00A is an authentic electronic component manufactured by Monolithic Power Systems, categorized under Development Tools. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official EV5991-V-4PHASE-00A datasheet above.
Electronic component spot-market pricing for EV5991-V-4PHASE-00A fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for EV5991-V-4PHASE-00A depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Raptor Lake Next puts DDR4 supply risk back in focus. Compare dated DDR4 vs DDR5 prices, supplier EOL updates and sourcing checks for 2027.
Read more →
Place ISL99390FRZ-TR5935 in a server power tree: a 3–16 V, 90 A smart power stage for controller-led point-of-load conversion, with explicit system limits.
Read more →
Plan MT40A512M16TB-062E:R DDR4 rails, exact TB package, commercial temperature limits and conditional PDN targets without unsupported supply-life forecasts.
Read more →
Use BMP390 pressure data for relative height with explicit weather-reference limits, correct IIR coefficients, conversion timing and enclosure constraints.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Monolithic Power Systems | -- | 6,120 | ||
![]() | Monolithic Power Systems | -- | 4,890 | ||
![]() | Monolithic Power Systems | -- | 5,290 | ||
![]() | Monolithic Power Systems | -- | 4,000 | ||
![]() | Monolithic Power Systems | 3,080 | |||
![]() | Monolithic Power Systems | -- | 4,950 | ||
![]() | Monolithic Power Systems | -- | 7,630 | ||
![]() | Monolithic Power Systems | -- | 7,060 | ||
![]() | Monolithic Power Systems | -- | 5,570 | ||
![]() | Monolithic Power Systems | -- | 8,730 |