
| Type | Description | ||
|---|---|---|---|
| Packaging | Cut Tape (CT) | Part Status | Obsolete |
| Manufacturer Lead Time | 4 Weeks | Access Time | 70 ns |
| Memory Format | FLASH | Memory Interface | Parallel |
| Memory Organization | 1M x 16 | Memory Size | 16Mbit |
| Memory Type | Non-Volatile | Mounting Type | Surface Mount |
| Operating Temperature | -40°C ~ 85°C (TA) | Package / Case | 46-TFBGA |
| Supplier Device Package | 46-TFBGA (6.39x6.37) | Technology | FLASH - NOR |
| Voltage - Supply | 2.7V ~ 3.6V | Write Cycle Time - Word, Page | 70ns |
| ExportControlClassNumber | EAR99 | HtsusCode | 8542.32.0071 |
| MoistureSensitivityLevel | 3 (168 Hours) | ReachStatus | REACH Unaffected |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
M28W160ECT70ZB6U TR is an authentic electronic component manufactured by Micron, categorized under Interface ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official M28W160ECT70ZB6U TR datasheet above.
Electronic component spot-market pricing for M28W160ECT70ZB6U TR fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for M28W160ECT70ZB6U TR depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Build a CC430F5133IRGZR battery budget from receive windows, startup, retries and board current. Compare timing choices with an explicit charge calculation.
Read more →
Synchronize TMS320F28335PGFA ADC sampling with ePWM: calculate acquisition and result timing, apply simultaneous sampling errata and meet the PWM update deadline.
Read more →
Choose TPS53513RVER Eco-mode or FCCM using load noise, idle power and startup settings, with clear ripple calculations and practical measurement checks.
Read more →
Route MT41K256M16TW-107:P DDR3L with clear VREF, VTT and ODT roles, byte-lane timing, continuous return paths and a documented initialization and validation plan.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Micron | - | 5,610 | ||
![]() | Micron | - | 3,670 | ||
![]() | Micron | -- | 6,550 | ||
![]() | Micron | 4,640 | |||
![]() | Micron | - | 6,010 | ||
![]() | Micron | - | 4,000 | ||
![]() | Micron | - | 3,460 | ||
![]() | Micron | 5,360 | |||
![]() | Micron | 6,810 | |||
![]() | Micron | - | 8,410 |