
STM32G474MET6: 184ps HRTIM, Dual-Bank Flash & LQFP80
Building digital power on STM32G474MET6? Map LQFP80 HRTIM fault pins, verify 512KB dual-bank flash updates and check MET3/RET6 limits. Request a quote.
Read more →
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR), Cut Tape (CT) | Part Status | Active |
| Manufacturer Lead Time | 10 Weeks | Mounting Type | Surface Mount |
| Number of Voltages Monitored | 1 | Operating Temperature | -40°C ~ 85°C (TA) |
| Output | Push-Pull, Totem Pole | Package / Case | 8-SOIC (0.154", 3.90mm Width) |
| Reset | Active Low | Reset Timeout | 140ms Minimum |
| Supplier Device Package | 8-SOIC | Type | Simple Reset/Power-On Reset |
| Voltage - Threshold | 4.65V | ExportControlClassNumber | EAR99 |
| HtsusCode | 8542.39.0060 | MoistureSensitivityLevel | 1 (Unlimited) |
| ReachStatus | REACH Unaffected | RohsStatus | ROHS3 Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
MAX705ESA+T is an authentic electronic component manufactured by Maxim, categorized under Interface ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official MAX705ESA+T datasheet above.
Electronic component spot-market pricing for MAX705ESA+T fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for MAX705ESA+T depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Building digital power on STM32G474MET6? Map LQFP80 HRTIM fault pins, verify 512KB dual-bank flash updates and check MET3/RET6 limits. Request a quote.
Read more →
Sourcing ADS1278IPAPT for simultaneous 24-bit DAQ? Compare 144kSPS vs 31mW/ch pin-selected modes, SPI/frame-sync data and PowerPAD. Request a quote.

Designing multi-channel RF clocks on LMX2594RHAT? Separate 15GHz phase sync from JESD204B SYSREF capture and lock VQFN-40 reel specs. Request a quote.
Read more →
Approving TMS320F28379DPTPT for production? Verify the 9-pair HLQFP176 ADC map, CPU1/CPU2 IPC boot and PowerPAD solder spec vs ZWT. Request a BOM quote.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
| Maxim | 1,500 | ||||
| Maxim | 1,410 | ||||
| Maxim | 6,340 | ||||
| Maxim | 2,980 | ||||
| Maxim | 3,600 | ||||
| Maxim | 2,000 | ||||
| Maxim | 4,220 | ||||
| Maxim | 7,310 | ||||
| Maxim | 5,680 | ||||
| Maxim | 1,590 |