
| Type | Description | ||
|---|---|---|---|
| Series | SMBJ | Packaging | Tape & Reel (TR), Cut Tape (CT) |
| Part Status | Active | Manufacturer Lead Time | 12 Weeks |
| Applications | General Purpose | Bidirectional Channels | 1 |
| Current - Peak Pulse (10/1000µs) | 10.3A | Mounting Type | Surface Mount |
| Operating Temperature | -55°C ~ 150°C (TJ) | Package / Case | DO-214AA, SMB |
| Power - Peak Pulse | 600W | Power Line Protection | No |
| Supplier Device Package | SMB | Type | Zener |
| Voltage - Breakdown (Min) | 40V | Voltage - Clamping (Max) @ Ipp | 58.1V |
| Voltage - Reverse Standoff (Typ) | 36V | ExportControlClassNumber | EAR99 |
| HtsusCode | 8541.10.0080 | MoistureSensitivityLevel | 1 (Unlimited) |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
SMBJ36CA-13-F is an authentic electronic component manufactured by Diodes, categorized under Surge Protective Devices - SPD. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official SMBJ36CA-13-F datasheet above.
Electronic component spot-market pricing for SMBJ36CA-13-F fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for SMBJ36CA-13-F depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →
Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Diodes | 3,950 | |||
![]() | Diodes | 2,260 | |||
![]() | Diodes | 4,630 | |||
![]() | Diodes | 8,260 | |||
![]() | Diodes | 1,830 | |||
![]() | Diodes | 6,680 | |||
![]() | Diodes | 5,930 | |||
![]() | Diodes | 7,330 | |||
![]() | Diodes | 4,160 | |||
![]() | Diodes | - | 5,820 |