
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR), Cut Tape (CT) | Part Status | Active |
| Manufacturer Lead Time | 12 Weeks | Applications | General Purpose |
| Current - Peak Pulse (10/1000µs) | 12.3A | Mounting Type | Surface Mount |
| Operating Temperature | -55°C ~ 150°C (TJ) | Package / Case | 2-SMD, Flat Leads |
| Power - Peak Pulse | 400W | Power Line Protection | No |
| Supplier Device Package | D-Flat | Type | Zener |
| Unidirectional Channels | 1 | Voltage - Breakdown (Min) | 22.2V |
| Voltage - Clamping (Max) @ Ipp | 32.4V | Voltage - Reverse Standoff (Typ) | 20V |
| ExportControlClassNumber | EAR99 | HtsusCode | 8541.10.0080 |
| MoistureSensitivityLevel | 1 (Unlimited) | ReachStatus | REACH Unaffected |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
P4SMAJ20ADF-13 is an authentic electronic component manufactured by Diodes, categorized under Surge Protective Devices - SPD. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official P4SMAJ20ADF-13 datasheet above.
Electronic component spot-market pricing for P4SMAJ20ADF-13 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for P4SMAJ20ADF-13 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Diodes | 5,000 | |||
![]() | Diodes | 8,200 | |||
![]() | Diodes | 9,570 | |||
![]() | Diodes | 3,620 | |||
![]() | Diodes | - | 9,860 | ||
![]() | Diodes | 3,290 | |||
![]() | Diodes | 3,820 | |||
![]() | Diodes | 4,050 | |||
![]() | Diodes | 9,810 | |||
![]() | Diodes | 3,180 |