
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR) | Part Status | Active |
| Manufacturer Lead Time | 12 Weeks | Applications | Ethernet |
| Bidirectional Channels | 1 | Capacitance @ Frequency | 1.2pF @ 1MHz |
| Grade | Automotive | Mounting Type | Surface Mount |
| Operating Temperature | -55°C ~ 150°C (TJ) | Package / Case | 2-UFDFN |
| Power Line Protection | No | Qualification | AEC-Q101 |
| Supplier Device Package | U-DFN1006-2/SWP | Type | Zener |
| Voltage - Breakdown (Min) | 100V | Voltage - Reverse Standoff (Typ) | 24V (Max) |
| ReachStatus | REACH Unknown | RoHS Status | Non-RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
DESD1ETH1GLPSQ-7B is an authentic electronic component manufactured by Diodes, categorized under Surge Protective Devices - SPD. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official DESD1ETH1GLPSQ-7B datasheet above.
Electronic component spot-market pricing for DESD1ETH1GLPSQ-7B fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for DESD1ETH1GLPSQ-7B depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Diodes | 9,950 | |||
![]() | Diodes | - | 1,090 | ||
![]() | Diodes | 4,490 | |||
![]() | Diodes | 5,810 | |||
![]() | Diodes | - | 5,660 | ||
![]() | Diodes | 3,430 | |||
![]() | Diodes | 6,670 | |||
![]() | Diodes | - | 6,440 | ||
![]() | Diodes | - | 6,620 | ||
![]() | Diodes | 7,790 |