
| Type | Description | ||
|---|---|---|---|
| Package | DFN2020-6-EP | Operating Temperature - | -40℃~+85℃ |
| Voltage - Supply | 2.7V~5.5V | RDS(on) | 70mΩ |
| Control Input Logic | Active High | Number of Channels | 1 |
| Type | High Side Switch | CNHTS | 8536500090 |
| USHTS | 8536507000 | TARIC | 8536500300 |
| CAHTS | 8536501000 | BRHTS | 85365090 |
| INHTS | 85365090 | MXHTS | 8536.50.09 |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
AP2311ASN-7 is an authentic electronic component manufactured by Diodes, categorized under Power Condition. It is supplied in the standard DFN2020-6-EP package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official AP2311ASN-7 datasheet above.
Electronic component spot-market pricing for AP2311ASN-7 fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for AP2311ASN-7 depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Give excess component inventory a clear next step. Prepare stock identity, condition and resale priorities, then submit your list to YG GROUP for review.
Read more →
Explore YG GROUP product solution support for sensing, industrial computing and GaN. Define your application and configuration, then send a project brief.
Read more →
Plan component order fulfillment around your BOM, packaging and build dates. Review preparation and shipping choices, then send YG GROUP your requirements.
Read more →
See how YG GROUP links source records, physical checks and risk-based tests. Share your component requirements and evidence needs with your next RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Diodes | 3,330 | |||
![]() | Diodes | 5,990 | |||
![]() | Diodes | 8,880 | |||
![]() | Diodes | 9,050 | |||
![]() | Diodes | 9,960 | |||
![]() | Diodes | 4,200 | |||
![]() | Diodes | 3,360 | |||
![]() | Diodes | 4,130 | |||
![]() | Diodes | 2,830 | |||
![]() | Diodes | 4,960 |