
| Type | Description | ||
|---|---|---|---|
| Manufacturer Part Number | CR1206-FX-8250ELF | Packaging | Reel |
| Packaging | Cut Tape | Standard Pack Qty | 5000 |
| BRHTS | 85332120 | CAHTS | 8533210000 |
| CNHTS | 8533211000 | ECCN | EAR99 |
| JPHTS | 853321000 | KRHTS | 8533219000 |
| MXHTS | 8533210100 | TARIC | 8533210000 |
| USHTS | 8533210030 | Factory Lead Time | 84 Days |
| RoHS Status | RoHS Compliant |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
CR1206-FX-8250ELF is an authentic electronic component manufactured by Bourns, categorized under Resistors. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official CR1206-FX-8250ELF datasheet above.
Electronic component spot-market pricing for CR1206-FX-8250ELF fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for CR1206-FX-8250ELF depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.
Read more →
Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.
Read more →
Using ISM330DHCXTR for motion offload? Check MLC rates, event latency and host duties before expanding the BOM. Send your sensor requirements for an RFQ.
Read more →
Evaluating ISOW1432DFMR? Compare integrated power, bus speed and EMC layout needs before ordering. Send your RS-485 port requirements for an RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Bourns | 4,400 | |||
![]() | Bourns | 1,790 | |||
![]() | Bourns | 7,500 | |||
![]() | Bourns | 1,540 | |||
![]() | Bourns | 1,560 | |||
![]() | Bourns | -- | 5,820 | ||
![]() | Bourns | 6,570 | |||
![]() | Bourns | 7,990 | |||
![]() | Bourns | 7,600 | |||
![]() | Bourns | 3,800 |