
| Type | Description | ||
|---|---|---|---|
| Packaging | Tape & Reel (TR), Cut Tape (CT) | Part Status | Active |
| Manufacturer Lead Time | 20 Weeks | Applications | CAN |
| Bidirectional Channels | 2 | Capacitance @ Frequency | 22pF @ 1MHz |
| Current - Peak Pulse (10/1000µs) | 8A (8/20µs) | Mounting Type | Surface Mount |
| Operating Temperature | -40°C ~ 150°C (TJ) | Package / Case | TO-236-3, SC-59, SOT-23-3 |
| Power Line Protection | No | Supplier Device Package | SOT-23 |
| Type | Zener | Voltage - Breakdown (Min) | 26.2V |
| Voltage - Clamping (Max) @ Ipp | 40V | Voltage - Reverse Standoff (Typ) | 24V |
| ExportControlClassNumber | EAR99 | HtsusCode | 8541.10.0080 |
| MoistureSensitivityLevel | 1 (Unlimited) | ReachStatus | REACH Unaffected |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
CDSOT23-T24CAN is an authentic electronic component manufactured by Bourns, categorized under Surge Protective Devices - SPD. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official CDSOT23-T24CAN datasheet above.
Electronic component spot-market pricing for CDSOT23-T24CAN fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for CDSOT23-T24CAN depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…

Loading articles…

Buying GRM155C80J106ME11D for a compact board? Compare effective capacitance, bias and packaging—not 10 µF alone. Send your rail requirements for an RFQ.
Read more →
Sourcing TPS53915RVER for a server rail? Map 12-A loads, bias supplies and PMBus functions before buying. Send your power-rail requirements for an RFQ.
Read more →
Replacing a relay with TPS1HB16AQPWPRQ1? Check inrush, A-version current limits and fault recovery before ordering. Send your 12-V load brief for an RFQ.
Read more →
Adding W5500 Ethernet to an MCU? Budget IPv4 sockets, SPI transfers and buffers before buying the network BOM. Send your board requirements for an RFQ.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Bourns | 8,200 | |||
![]() | Bourns | 6,080 | |||
![]() | Bourns | 5,140 | |||
![]() | Bourns | 4,410 | |||
![]() | Bourns | 3,400 | |||
![]() | Bourns | 8,210 | |||
![]() | Bourns | 1,730 | |||
![]() | Bourns | 5,790 | |||
![]() | Bourns | 6,740 | |||
![]() | Bourns | 9,150 |