
| Type | Description | ||
|---|---|---|---|
| Contact Plating | Lead, Tin | Mount | Through Hole |
| Packaging | Bulk | JESD-609 Code | e0 |
| Pbfree Code | no | Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
| Number of Terminations | 8 | ECCN Code | EAR99 |
| Terminal Finish | Tin/Lead (Sn/Pb) | Max Operating Temperature | 125°C |
| Min Operating Temperature | -55°C | Technology | CMOS |
| Terminal Position | DUAL | Peak Reflow Temperature (Cel) | 240 |
| Reach Compliance Code | not_compliant | Time@Peak Reflow Temperature-Max (s) | 20 |
| JESD-30 Code | R-XDIP-T8 | Number of Outputs | 2 |
| Qualification Status | Not Qualified | Output Type | Adjustable, Fixed |
YG GROUP (YUGUANG INTERNATIONAL(HK)CO.,LTD) supports reliable sourcing through quality controls and compliance documentation. Please confirm product requirements, applicable certifications and supporting documents before ordering.
5962-9212601MPA is an authentic electronic component manufactured by Analog Devices, categorized under Power Management ICs. It is supplied in the standard manufacturer-specified package footprint, providing industry-standard mechanical dimensions and terminal configurations for board-level assembly. Full pinout configurations, physical footprint drawings, and rated operating tolerances are documented in the official 5962-9212601MPA datasheet above.
Electronic component spot-market pricing for 5962-9212601MPA fluctuates based on real-time global availability, production date codes, minimum order quantities (MOQ), and packaging formats (e.g., Reel, Tube, Tray). Using an RFQ ensures you receive accurate, real-time volume pricing tied to verified, traceable inventory rather than stale catalog estimates.
Lead times for 5962-9212601MPA depend on whether stock is dispatched from our central hub or regional franchise partners. Ready-to-ship inventory typically leaves the warehouse within 1–3 business days following quality inspection, while factory-direct or back-ordered allocations are confirmed with an estimated ship date upon RFQ reply.
Loading articles…
Loading articles…

Build a CC430F5133IRGZR battery budget from receive windows, startup, retries and board current. Compare timing choices with an explicit charge calculation.
Read more →
Synchronize TMS320F28335PGFA ADC sampling with ePWM: calculate acquisition and result timing, apply simultaneous sampling errata and meet the PWM update deadline.
Read more →
Choose TPS53513RVER Eco-mode or FCCM using load noise, idle power and startup settings, with clear ripple calculations and practical measurement checks.
Read more →
Route MT41K256M16TW-107:P DDR3L with clear VREF, VTT and ODT roles, byte-lane timing, continuous return paths and a documented initialization and validation plan.
Read more →Loading related products…
| Picture | Part Number | Manufacturer | PDF / RoHS | Stock | Action |
|---|---|---|---|---|---|
![]() | Analog Devices | 4,280 | |||
![]() | Analog Devices | 3,750 | |||
![]() | Analog Devices | 5,090 | |||
![]() | Analog Devices | 5,430 | |||
![]() | Analog Devices | 6,040 | |||
![]() | Analog Devices | 5,180 | |||
![]() | Analog Devices | 6,860 | |||
![]() | Analog Devices | 5,890 | |||
![]() | Analog Devices | -- | 7,380 | ||
![]() | Analog Devices | 7,220 |